What you are actually paying for in a machined part price
July 10, 2026
Two shops quote the same drawing at 6.80 and 11.20 per piece. Neither is cheating. They are making different assumptions about five things, and once you know what those are, you can ask questions that close most of the gap.
1. Machine time
The dominant line on most parts. It is cycle time multiplied by an hourly rate, and cycle time is driven by:
- Material removed. Volume of chips, not size of part
- Material type. Aluminium cuts several times faster than stainless, which cuts faster than titanium
- The smallest tool in the job. A 2 mm corner radius forces a small cutter and the whole pocket slows down
- Finishing passes. Tolerance and surface finish decide how many
- Tool changes. Each one is seconds that multiply across a batch
The design lever here is geometry. The DFM checklist covers the specific features that cost the most time.
2. Setup and programming
One-off costs that get divided by your quantity. Programming, fixture design and build, first article, machine set. On a quantity of 10, setup can be half the price of every part. On 1,000 it disappears into the noise.
This is why quantity is the most important number in a request, and why the price at twice your quantity is the most useful second number to ask for.
3. Material
Two components that behave differently:
The metal itself. Priced per kilogram of stock bought, not of part delivered. A part machined from a solid block where 80 percent becomes chips is paying for all of it.
The form. Bar stock is cheaper to buy and to hold than plate. A part that can be made from standard bar is cheaper than one that needs a large block, even at the same finished weight.
Availability affects price indirectly through lead time. A grade that has to be imported ties up working capital and adds risk, and shops price that in.
4. Secondary operations
Everything that happens after the machine: deburring, heat treatment, grinding, finishing, assembly, marking. Most are subcontracted, which adds handling, freight between suppliers and a minimum batch charge from the finisher.
Small orders are hit hardest here. A finisher with a minimum lot charge will price your 30 pieces the same as 300.
5. Inspection and risk
The invisible line. A shop quoting a tight tolerance part includes:
- The measurement time per piece or per sample
- The cost of the pieces it expects to scrap
- The cost of a possible full batch failure, weighted by how likely that feels
This is why tolerance is such a powerful lever and why a blanket tight tolerance is the most expensive thing on a drawing. It does not just add inspection. It adds fear, and fear is priced.
Where each lever actually lives
| Lever | Who controls it | Typical effect |
|---|---|---|
| Corner radii and pocket depth | You | Large on complex parts |
| Tolerance scheme | You | Large |
| Quantity and repeat commitment | You | Very large |
| Material grade and form | Shared | Moderate |
| Finishing spec | You | Moderate |
| Machine choice and process | The shop | Moderate |
| Hourly rate | The shop | Less than buyers assume |
Four of the top five are yours. Negotiating the hourly rate is the least effective thing you can do, which is why experienced buyers spend their time on the drawing instead.
Three questions that move the number
- “What would you change on this drawing to make it cheaper?” The answer is free DFM and a test of how carefully the shop read your part.
- “What is the price at twice the quantity?” It tells you how much of the price is setup, which tells you whether to order more now.
- “Which single feature costs the most time?” Most parts have one. Often it is a corner radius or a tolerance that nobody has questioned since the part was designed.
A worked example
Take a 6061 bracket, 180 x 90 x 40 mm, features on two faces, four toleranced bores, bead blasted, at 250 pieces. A plausible build-up looks like this:
| Line | Share of the unit price |
|---|---|
| Material, including the part that becomes chips | 15 to 25 percent |
| Machine time, both operations | 40 to 50 percent |
| Setup, programming and fixture, spread over 250 | 8 to 15 percent |
| Deburr and bead blast | 5 to 10 percent |
| Inspection | 3 to 8 percent |
| Margin and risk | the rest |
Change one thing and watch which line moves. Drop the quantity to 25 and the setup share can triple. Switch to stainless and the machine time line grows while everything else stays put. Tighten the bores from ±0.05 to ±0.01 mm and inspection plus risk can double.
That is the whole point of the breakdown. It tells you which change is worth arguing for.
Where buyers waste their leverage
Three common moves that do not work:
- Pushing on the hourly rate. It is the least flexible number in the quote and the one the shop defends hardest.
- Asking every shop for their best price without changing anything. You get a small discount and a shop that starts looking for something to cut.
- Splitting a small order across two suppliers to create competition. You now pay two setups for the same part.
The moves that do work are all upstream: quantity, tolerance, geometry and giving the shop enough information to stop pricing uncertainty.
Once the quotes come back, the guide on comparing three quotes covers how to normalise them. When you are ready for prices on your own part, send the drawing.
Questions we get on this
Roughly how is a machining quote built up?
Material, plus machine time at an hourly rate, plus setup and programming spread over the quantity, plus any secondary operations and finishing, plus inspection, plus a margin that also covers scrap risk. The proportions shift enormously with quantity.
Why is my second order cheaper than my first?
Programming and fixturing are done, the process is proven and the scrap risk is known rather than assumed. Ask for the repeat price when you place the first order so you can plan with it.
Does the hourly rate tell me anything useful?
Only in combination with cycle time. A shop with a higher rate and a better machine can be cheaper per part. Compare the total at your quantity, not the rate.
Have a part like this?
Send the drawing. We shortlist the shop we place it with that run the process and material, and answer within 24 business hours.
Send a drawing